Username
Password
 
Ampliar Imágen
NOBLE GRAIN - MACROMET S.A. (Timbues - Argentina)
Basic Engineering and Steel Detailing of structure of industrial-type steel, including railings, stairs, floors and anchor bolts.

GROSS WEIGHT: 270 Tons.
PROJECT DURATION: 2 Months.
END DATE: June, 2009.

+ To navigate Project in 3D
Ampliar Imágen
ASTILLERO ULTRAPETROL - SENZACQUA HNOS S.R.L. (San Lorenzo - Argentina)
Basic Engineering and Steel Detailing of structure of industrial-type steel, including railings, stairs, floors and anchor bolts.

GROSS WEIGHT: 1000 Tons.
PROJECT DURATION: 10 Months.
END DATE: December, 2008.

+ To navigate Project in 3D
Ampliar Imágen
MINA PIRQUITAS - SENZACQUA HNOS S.R.L. (Jujuy - Argentina)
Basic Engineering and Steel Detailing of structure of industrial-type steel, including railings, stairs, floors and anchor bolts.

GROSS WEIGHT: 304 Tons.
PROJECT DURATION: 3 Months.
END DATE: June, 2008.

+ To navigate Project in 3D
Ampliar Imágen
SHELL CAPSA - MONTAJES IMECA S.A. (Bs.As - Argentina)
Basic Engineering and Steel Detailing of structure of industrial-type steel, including railings, stairs, floors and anchor bolts.

GROSS WEIGHT: 104 Tons.
PROJECT DURATION: 1-1/2 Month.
END DATE: May, 2008.

+ To navigate Project in 3D
Ampliar Imágen
VELADERO CARGUIO CAMIONES, SURGE BIN,PRIMARY CRUSHER Y SECONDARY - SENZACQUA HNOS S.R.L. (San Juan - Argentina)
Basic Engineering and Steel Detailing of structure of industrial-type steel, including railings, stairs, floors and anchor bolts.

GROSS WEIGHT: 680 Tons.
PROJECT DURATION: 6 Months.
END DATE: January, 2008.

+ To navigate Project in 3D
Ampliar Imágen
PATAGONIA BIODIESEL, PROCESO Y PRE-TRATAMIENTO- VERDU S.A. (San Lorenzo - Argentina)
Basic Engineering and Steel Detailing of structure of industrial-type steel, including railings, stairs, floors and anchor bolts.

GROSS WEIGHT: 360 Tons.
PROJECT DURATION: 2 Months.
END DATE: October, 2007.

+ To navigate Project in 3D
Ampliar Imágen
PLANTA BIODIESEL VICENTIN - VERDU S.A. (Timbues - Argentina)
Basic Engineering and Steel Detailing of structure of industrial-type steel, including railings, stairs, floors and anchor bolts.

GROSS WEIGHT: 140 Tons.
PROJECT DURATION: 45 Days.
END DATE: November, 2006.

+ To navigate Project in 3D
Ampliar Imágen
DESCASCARADO MOLINOS - VERDU S.A. (San Lorenzo - Argentina)
Basic Engineering and Steel Detailing of structure of industrial-type steel, including railings, stairs, floors and anchor bolts.

GROSS WEIGHT: 900 Tons.
PROJECT DURATION: 4 Months.
END DATE: October, 2006.

+ To navigate Project in 3D
Design by:
CADESING S.R.L.
  ©2010 - CADESING S.R.L
Sgto. Cabral 1746 PB Dpto. 6 - (S3000AVP) - Santa Fe - Argentina
Tel/Fax: +54 342 4120401 / +54 342 4555585